Concrete calculator

Work out how much concrete a slab, footing, column or set of steps needs, in cubic yards or cubic meters, and how many 40–90 lb bags to buy.

Last verified: Methodology

Your details

01Project

Units
What are you pouring?

02Dimensions

Feet in US units, meters in metric.

Inches in US units, centimeters in metric. 4 in is about 10 cm.

03Bags and cost

Bag yields from the QUIKRETE Concrete Mix data sheet. Check the yield printed on your bag.

NRMCA recommends ordering 4–10% more than the measured volume for waste, spillage and uneven ground.

Example price. Enter what your store charges.

Concrete to order

1.36

cubic yards

Concrete to order
1.36 cu yd
Measured volume (no allowance)
1.23 cu yd
Order volume in cubic feet / liters
36.67 cu ft
Bags to buy
62
Bag cost
$372
  • Includes a 10% order allowance. NRMCA recommends 4–10% extra for waste, spillage, uneven subgrade and form movement.
  • Bag yields are the manufacturer's approximate figures for QUIKRETE Concrete Mix. Other brands print their own yield on the bag.
  • At a cubic yard or more, compare the bag price with a ready-mix delivery quote, which is sold by the cubic yard.

Concrete to order: 1.36 cubic yards

Bags needed by bag size

For 1.36 cu yd including a 10% allowance. Yields from the QUIKRETE Concrete Mix data sheet; round up to whole bags.

BagYield (cu ft)BagsTotal weight (lb)
40 lb0.31234,920
50 lb0.38984,900
60 lb0.45824,920
80 lb0.6624,960
90 lb0.68554,950

1.36

cubic yards

How it's calculated

The calculator works out the volume of the concrete you will place, adds an order allowance, then divides by the yield of one bag of mix. It handles four common pours: a flat slab (patio, shed base, walkway), a continuous footing, round columns or post holes, and a run of solid steps.

Volume comes first, in cubic feet. Ready-mix concrete is sold by the cubic yard (27 cubic feet) or the cubic meter, so the result is shown in those units too. Bagged mix is sold by weight, and each bag makes a set volume of concrete. QUIKRETE's data sheet for its Concrete Mix (No. 1101) lists approximate yields of 0.30 cu ft for a 40 lb bag, 0.45 cu ft for 60 lb, 0.60 cu ft for 80 lb and 0.675 cu ft for 90 lb QUIKRETE. The bag count is always rounded up, because a pour that runs short leaves a cold joint.

The order allowance covers spillage, uneven ground, forms that bow and a slab that ends up a little thicker than planned. The National Ready Mixed Concrete Association recommends ordering 4 to 10 percent more than the volume measured from plan dimensions NRMCA. The calculator starts at 10% because a bagged pour can't call for another truck; lower it if your forms and subgrade are accurate.

The formula

  1. Slab or footing: volume = length × width × thickness (all in feet; inches ÷ 12).
  2. Round column: volume = π × (diameter ÷ 2)² × height × number of columns.
  3. Steps: volume = width × run × rise × n(n + 1) ÷ 2, where n is the number of steps. Each step is treated as a solid block from the ground up, so the bottom step is one rise tall and the top step is n rises tall.
  4. Order volume = volume × (1 + allowance %).
  5. Cubic yards = cubic feet ÷ 27. Cubic meters = cubic feet × 0.028316846592, from the exact definition 1 ft = 0.3048 m in NIST's SI guide NIST.
  6. Bags = order volume ÷ bag yield, rounded up to a whole bag.

Worked example

QUIKRETE's own training module works a 10 ft × 6 ft slab, 4 in thick: 10 × 6 × 0.333 ft = 20 cubic feet, which it divides by 0.60 for 80 lb bags and by 0.45 for 60 lb bags QUIKRETE. With no allowance the calculator gives the same 20 cu ft, and rounds up to 34 bags of 80 lb mix or 45 bags of 60 lb mix. The training module rounds its quotients to the nearest bag; buying the whole number above is the safer choice.

Now the default project: a 10 × 10 ft patio slab, 4 in thick, with a 10% allowance.

10 × 10 ft slab, 4 in thick, 10% allowanceCONCRETE / +10% / $372

Concrete to order: 1.36 cubic yards

That is 1.36 cu yd to order, or 62 bags of 80 lb mix. At the example price of $6 a bag the mix costs $372.

A single 12 in round column 4 ft deep needs 0.12 cu yd (π × 0.5² × 4 cubic feet), and three steps 4 ft wide with a 7 in rise and 11 in run need 0.48 cu yd.

Assumptions and limitations

  • Bag yields are approximate. They are the manufacturer's figures for QUIKRETE Concrete Mix. Other mixes (high-strength, fast-setting, other brands) print their own yield on the bag; if yours differs, divide the cubic-foot volume by your bag's yield.
  • Solid shapes only. Steps are modeled as solid blocks, not a sloped slab with treads. Hollow forms, rebar and embedded objects aren't subtracted (they take up very little volume).
  • The allowance is a judgment call. NRMCA's 4–10% range is for contingencies such as waste and over-excavation; a sloping or soft subgrade can need more. NRMCA notes that just 1/8 in of extra thickness on a 4 in slab adds about 3 percent.
  • Gravel base not included. A slab usually sits on a compacted base; use the gravel calculator for that.
  • Bags vs ready-mix. Past a cubic yard or so, get a ready-mix quote; it is sold by the cubic yard and arrives mixed.
  • Prices are examples. Enter what your store charges.

For a wider walk-through of measuring, waste allowances and ordering, see our guide to estimating materials for home projects.

FAQ

Questions people ask

How do I calculate how much concrete I need?

Multiply length by width by thickness, with every measurement in feet, to get cubic feet. Convert inches to feet by dividing by 12. Divide cubic feet by 27 for cubic yards. Then add an allowance for waste and uneven ground before you order. The calculator does this for slabs, footings, round columns and steps, and converts the result to bags or cubic meters.

How many bags of concrete are in a cubic yard?

Divide 27 cubic feet by the yield printed on the bag. QUIKRETE lists about 0.60 cubic feet for an 80 lb bag of Concrete Mix, 0.45 for a 60 lb bag and 0.30 for a 40 lb bag, so smaller bags add up quickly. Always round up to whole bags, and check the yield on the brand you buy, since mixes differ.

How much extra concrete should I order?

The National Ready Mixed Concrete Association recommends ordering 4 to 10 percent more than the volume calculated from plan dimensions. The extra covers spillage, forms that bulge, over-excavation and a subgrade that is not perfectly flat. Even a slightly thicker slab than planned uses noticeably more concrete, so do not skip the allowance, especially on a bagged pour where running out is hard to fix.

Should I use bags or ready-mix concrete?

Bags suit small jobs such as post holes, steps, pads and short walkways, because you can mix what you need. Once a project needs around a cubic yard or more, ask a ready-mix supplier for a delivered price per cubic yard and compare it with the bag count and your labor. Ready-mix arrives mixed, which also gives a more even pour on a large slab.

How thick should a concrete slab be?

Many small patios, walkways and shed bases are poured 4 inches thick, and slabs that carry vehicles are often thicker. The right thickness depends on the load, the soil and local building rules, so check your plans or local code. Whatever you choose, measure the actual depth of your forms in several places, because average thickness drives the volume.

How do I calculate concrete for steps?

Treat each step as a solid block from the ground to its top. The bottom step is one rise tall, the next is two rises, and so on. Add the blocks together: step width times run times rise times the sum of one through the number of steps. Enter the number of steps, width, rise and run, and the calculator adds the allowance and counts bags.

Sources

  1. QUIKRETEQUIKRETE Concrete Mix No. 1101 data sheet (bag yields) · retrieved 2026-10-16
  2. QUIKRETETraining Module 3: Mixing & Placing Cement & Concrete Mixes (slab example) · retrieved 2026-10-16
  3. National Ready Mixed Concrete AssociationCIP 8 – Discrepancies in Yield · retrieved 2026-10-16
  4. National Ready Mixed Concrete AssociationCIP 31 – Ordering Ready Mixed Concrete · retrieved 2026-10-16
  5. NISTNIST SP 811 Appendix B.8: Factors for Units Listed Alphabetically · retrieved 2026-10-16
  6. IRSPublication 15-T (2026), Federal Income Tax Withholding Methods · retrieved 2026-10-16
  7. IRSPublication 15 (2026), (Circular E), Employer's Tax Guide · retrieved 2026-10-16
  8. IRSRev. Proc. 2025-32: 2026 inflation-adjusted tax items · retrieved 2026-10-16
  9. IRSForm W-4 (2026), Employee's Withholding Certificate · retrieved 2026-10-16
  10. IRSPublication 505 (2026), Tax Withholding and Estimated Tax · retrieved 2026-10-16
  11. IRSForm 1040-ES (2026), Estimated Tax for Individuals · retrieved 2026-10-16
  12. IRSSchedule 1-A (Form 1040) 2026, Additional Deductions (early-release draft) · retrieved 2026-10-16
  13. IRSSchedule 8812 (Form 1040) 2026, Credits for Qualifying Children and Other Dependents (early-release draft) · retrieved 2026-10-16
  14. IRSWorking Families Tax Cuts: Individuals and workers (tips, overtime, seniors, car loan interest) · retrieved 2026-10-16
  15. IRSWorking Families Tax Cuts provisions (charitable deduction for non-itemizers, Section 70424) · retrieved 2026-10-16
  16. IRSChild Tax Credit · retrieved 2026-10-16
  17. IRSIR-2025-111: 401(k) limit increases to $24,500 for 2026 · retrieved 2026-10-16
  18. IRSRev. Proc. 2025-19: 2026 HSA limits · retrieved 2026-10-16

Last verified: CalcBloc Editorial Team